USACE Projects

LWSC Fish Ladder PLC Upgrade
RJS provided the field surveying of the existing componentry of the Lake Washington Fish Ladder Programable Logic Controller (PLC) and determined the needed replacement components to upgrade to a modern Allen Bradley system of controls. The work includes the detailed review of the existing system, the preparation and approval for design documentation, the fabrication of new UL rated cabinets and control devices, the scheduled removal of existing PLC componentry and installation of modern PLC and Operator Interface Terminal (OIT) components. Upon final testing of the new fish ladder control systems, RJS provided all needed training on the newly refurbished system and issues detailed manuals on the use and maintenance of the associated products and equipment.
Contract: W912DW18P0093
Contract Value: $151,322
Location: Lake Washington, Seattle, WA
Project Delivery: Design Build

LWSC Small Lock Machinery Replacement
USACE partnered with T1-RJS to remove and replace the small locks equipment in a very abbreviated window of time. To successfully complete this assignment T1-RJS is required to remove and replace the miter gate equipment as well as renovate the pumping and control systems to fully operate the lock passageway. T1-RJS’s primary concern is meeting the fabrication window of the hydraulic cylinders, used to operate the gate and valve assemblies of the facility. T1-RJS is currently removing and replacing the antique hydraulics with larger, custom-made equipment that has been fabricated and soon to be installed in the precise layout of the below grade chambers. T1-RJS and Coffman Engineers performed Cloud Point Surveying services on each of the project’s equipment chambers to confirm the new equipment componentry will fully operate within the confine of the design space. Overall, this project has meticulously demonstrated another example of how T1-RJS utilize effective discernment and intellect to assure seamless installation of componentry that occur on Mission Critical projects.
Contract: W912DW23R0030
Contract Value: $16M
Location: Lake Washington, Seattle, WA
Project Delivery: Firm Fixed Price

USACE Mud Mountain Dam Fish Passage Facility
T1-RJS JV undertook a complex project encompassing the removal of outdated pit tag readers, precise saw cutting of 20 orifices, meticulous smoothing of concrete surfaces to ensure fish-friendly conditions, and substitution of old pit tag reader locations with HDPE material. Additional retrofitting and upgrading the current fish transportation equipment, freeze protection improvements, existing hoist upgrades, fall protection upgrades, metal repairs, fish tag system improvements, gate structure improvements and removal of a large debris boom took place. Throughout this endeavor, T1-RJS JV encountered formidable challenges, chiefly dictated by adverse weather conditions.
Contract: W912DW23R00080005
Contract Value: $4.6M
Location: Enumclaw, WA

Bonneville B-Branch Fish Ladder Erosion Repair
T1-RJS JV was contracted by USACE Portland to complete repairs of the damaged shoreline embankment along the B Branch fish ladder. The embankment just below the Bonneville Dam spillway washed out during a spill event in 2021, leaving the B Branch fish ladder exposed to potential damage, and further shoreline erosion. T1-RJS teamed with J.E. McAmis to utilize their custom-built “Sea Jetty” construction CAT excavator capable of moving 40-ton boulders. The excavator was secured on the bow of a 211 Foot Barge to reach into the waterway and handle the displaced boulders. The initial contract called for the import of approximately 2,900 tons of W100 stones which were to be transported on the fellow 250-foot barge “Ellis Island”. Approximately 3,600 tons of rock was lifted from the riverbed. While a portion of the recovered material was placed to rebuild portions of the embankment, a change order was later awarded to procure, deliver, and place an additional 4,800 tons of R3000 Class Riprap. The Bonneville Dam site is a highly secure area and subject to rapid weather changes, equipment breakdowns, and other factors related to the ongoing operation of the facility
Contract:W9127N21C0016
Contract Value: $7,016,446
Location: Bonneville Dam, OR
Project Delivery: Sole Source
Additional Projects
Heavy Equipment Shed and Administration Compound Improvements
Contract Number: WP12PP20P0050
Contract Value: $249,833.00
Location: Trinidad, CO
Bonneville Powerhouse 1 Elevator 2 Ventilation
Contract Number: W9127N19C0002
Contract Value: $404,113.00
Location: Bonneville Dam, OR
John Day Unwatering Pump Replace
Contract Number: W9127N21C0028
Contract Value: $1,684,691.9
Location: John Day Dam, OR
Bonneville Powerhouse 1 Control Room Fire Protection
Contract Number: W9127N18C0021
Contract Value: $4,145,000
Location: Bonneville Dam, OR
Little Goose & Lower Granite Dam Fishway Control
Contract Number: W912EF-15-C-0008
Contract Value: $303,000
Location: Dayton, WA
